Calcoid

Mortar Calculator

Estimate bags of mortar mix, plus sand and Portland cement for site-mixed jobs. Bricks, blocks, or stone, with N/S/M/O mix ratios.

Wall and mortar details

Mortar you need

17 bags (80 lb)

Wall area
80 sq ft
Square meters
7.43 sq m
Mortar volume
4.84 cu ft
Cubic yards
0.18 cu yd
60 lb bags
22
Portland cement (94 lb bags)
1
Sand weight
581 lb

Type N (750 psi): General use above grade. Most common mix for exterior walls and chimneys.

Mortar Type Reference

Mortar typeTypical useRelative strength
Type NAbove-grade brick and blockMedium
Type SBelow-grade and higher-load masonryHigh
Type MHeavy-load stone and foundationsVery high
Type OInterior or soft historic brickLow
Type KSoft historic masonry restorationVery low

Frequently Asked Questions about the Mortar Calculator

How many bags of mortar do I need per 1,000 bricks?
For standard modular brick with 3/8 in joints, you need 28 80 lb bags before waste because 1,000 divided by the published coverage of up to 37 bricks per bag rounds up. The equivalent 60 lb count is 36 bags at up to 28 bricks per bag. Larger bricks can need fewer bags, and thicker joints or waste increase the count. Check the product label before ordering.
Should I buy premixed mortar or mix it from sand and Portland cement?
Premixed bags (Quikrete Mortar Mix, Sakrete Type N, etc.) are convenient and quality-controlled. Mixing from sand and Portland is cheaper at volume and lets you tune ratios. For small jobs, premixed wins. For >50 bags of work, site-mixed wins.
What is the difference between Type N, S, M, and O mortar?
Type N (1:1:6 cement:lime:sand): general above-grade work, the most common. Type S (2:1:9): higher strength, below-grade or load-bearing. Type M (3:1:12): highest strength, foundations and retaining walls. Type O (1:2:9): lowest strength, interior non-load-bearing only. The calculator supports all four ratios.
How much sand do I need with Portland cement?
By volume, Type N uses about 6 parts sand to 1 part Portland (and 1 part lime). A cubic yard of mortar needs roughly 1.4 tons of sand and 7-9 bags of Portland cement, depending on density and waste.
How much waste should I add?
Plan on 10-15% waste for typical brick or block work. More if you are cutting a lot (decorative patterns, curves) or working with inexperienced helpers. The calculator defaults to 10% and lets you bump it.

Related Calculators

More calculators in "Home & Cooking"

See all 109 calculators in "Home & Cooking"